Carriageway works on at Tiruverumbur

The National Highways Authority of India (NHAI) has noticeably reclaimed most of the encroached land in front of shops at Tiruverumbur along the Thanjavur National Highway for laying the main carriageway as part of the four-laning project.

Though the shopkeepers were given adequate time to remove encroached structures in the frontage, they refused to relent, and on Tuesday, the Madhucon Projects Limited, which executes the national highway project on a build-operate-transfer basis in the Tiruchi-Thanjavur section at a cost of Rs.280 crore, went ahead with raising the road level, right at the doorsteps of the shops.

The shops would have to shift in due course in the event of the NHAI occupying the land required for laying a service lane, an absolute necessity for the public, particularly for the hundreds of commuters utilising the Tiruverumbur railway station, according to BHEL employees.

During March this year, M/s. Tiruchi-Thanjavur Expressways Limited started collecting toll at the toll plaza beyond Thuvakudi on the city outskirts, even though work on construction of two road overbridges across level crossing at Tiruverumbur and Ariyamangalam remained incomplete.

Tardy work

The pace of work at Ariyamangalam road overbridge is, however, tardy. Regular road users have got used to frequent traffic hold-ups, particularly during night hours, at this spot.


Share on FacebookShare on TwitterShare on Google+Report this post
Top
  
Reply with quote  
PostPosted: Wed Dec 07, 2011 11:12 pm 
shyam1574 wrote:
Image

Image

Image

Image

Image



thank's shyam ;)


Share on FacebookShare on TwitterShare on Google+Report this post
Top
  
Reply with quote  
PostPosted: Wed Dec 07, 2011 10:39 pm 
Offline

Joined: Wed Jul 28, 2010 10:56 pm
Posts: 32
Has thanked: 0 time
Been thanked: 0 time
Image

Image

Image

Image

Image

_________________
( join hand's https://www.facebook.com/trichinopoly )

( also join hand's https://www.facebook.com/groups/trichinopoly )



Share on FacebookShare on TwitterShare on Google+Report this post
Top
 Profile  
Reply with quote  
PostPosted: Wed Dec 07, 2011 10:37 pm 
shyam1574 wrote:
Image

Image

Image

Image

Image




can you repost it again??


Share on FacebookShare on TwitterShare on Google+Report this post
Top
  
Reply with quote  
PostPosted: Wed Dec 07, 2011 10:27 pm 
Image

as part of the road expansion, the bus stand and shelter on the left side in thiruverambur is being removed.


Share on FacebookShare on TwitterShare on Google+Report this post
Top
  
Reply with quote  
PostPosted: Wed Dec 07, 2011 10:07 pm 
Offline

Joined: Wed Jul 28, 2010 10:56 pm
Posts: 32
Has thanked: 0 time
Been thanked: 0 time
Image
Image
Image
Image
Image

_________________
( join hand's https://www.facebook.com/trichinopoly )

( also join hand's https://www.facebook.com/groups/trichinopoly )



Last edited by shyam1574 on Wed Dec 07, 2011 10:37 pm, edited 1 time in total.

Share on FacebookShare on TwitterShare on Google+Report this post
Top
 Profile  
Reply with quote  
PostPosted: Thu Aug 18, 2011 10:15 am 
Land to be acquired for service lanes along Palpannai-Thuvakudi stretch

Image

Residents of hundreds of localities on either side of the 14.5 km Palpannai-Thuvakudi stretch of Tiruchi-Thanjavur highway have a cause for cheer.

The State government on Tuesday came out with a positive indication that the required land will be acquired for handing over to the National Highways Authority of India (NHAI) for laying service lanes.

During the course of the Assembly proceedings, the State Minister for Highways and Minor Ports Edappadi K.Palanisamy informed that the government has a proposal to acquire land at a cost of Rs.84.5crore.

The Minister's reply was to a question listed for discussion by the Tiruverumbur MLA S.Senthil Kumar of DMDK. Mr.Senthil Kumar thanked the Minister on behalf of the public in Tiruverumbur constituency.

At present, the service-lanes are being laid in parts at those spots where lands are in the possession of the National Highways Authority of India. Elsewhere, the trading community had been putting up a stiff resistance against land acquisition.

For the last few years, the Federation for Retrieval of Tiruchi Palpannai–Thuvakudi Service Road, encompassing residents' associations, has been in the forefront of demanding the service roads for the 14.5 km accident-prone stretch.

The public were disenchanted with the previous regime for budging to the pressure exerted by the trading community and forcing the NHAI to abandon its original plan for laying service roads.

The NHAI had devised its plan taking cognisance of the presence of major industries like BHEL, Golden Rock Workshop, two ordnance factories, industrial estates, important government offices, and a plethora of educational institutions.

Following repeated representations by the federation, the NHAI had promised that it would pursue in right earnest the proposal for construction of service roads at a cost of Rs.54 crore under the National Highways Development Project Phase – VII in the event of the State government meeting the land acquisition cost.


Share on FacebookShare on TwitterShare on Google+Report this post
Top
  
Reply with quote  
PostPosted: Wed Jul 13, 2011 6:43 am 
NHAI plans to construct new underpass in Tiruverambur

Much to the relief of Tiruverambur residents, the National Highways Authority of India (NHAI) is on course to construct an underpass beneath the road over-bridge at a close distance from the entrance to the railway station, as part of the Tiruchi-Thanjavur four-lane project.

According to official sources, the underpass will have a breadth of seven metres and height of 3.5 metres for two-way movement of pedestrians, two-wheelers and four wheelers.

Such an arrangement is an imperative in the area teeming with commercial establishments. Also, the Government Industrial Training Institute and the Mukkalathor Higher Secondary School are located on opposite sides, locals say.

Motorists proceeding from the city towards the Navalpattu road will be able to take a ‘u' turn towards left and go through the underpass once it is ready, without causing hindrance to the flow of traffic on the ever-busy highway. The point where the Navalpattu road branches off from the National Highway has always been nightmare for traffic cops. Not a day passes without traffic jams due to the congestion at this particular point.

The location of the bus stand right on one half of the main road is also a vital cause for traffic congestion. While the NHAI is learnt to have compensated the town panchayat for the bus shelter, neither the public nor the town panchayat authorities are clear about where the bus stand will be shifted. Without a satellite bus stand, maintaining orderly movements of people and traffic would continue to be a tough task, local traders reckon.

The NHAI officials have reportedly assured the Tiruverambur MLA S.Senthilkumar that the works on construction of a new overbridge parallel to the existing one will be expedited.

The new overbridge will be constructed with provision for the underpass, and subsequently the existing overbridge will be closed for traffic till the work on the underpass gets completed.

The trading community has reportedly been cautioned by NHAI against putting up structures near the spots earmarked for entrance and exit points of the underpass.

The NHAI has started off with laying the pile foundation for the new overbridge.

While welcoming the construction of the underpass, Balasundaram, a resident of the town, says it may not serve the interests of pedestrians.

“A foot-over bridge has to be constructed at the central part of the town for the convenience of pedestrians, particularly for the aged and the student community,” he said, explaining that Tiruverambur town is always crowded since it is the closest town to peripheral areas within the radius of more than 10 kilometres.

With Tiruverambur getting annexed to the city limits in only a matter of months, the onus will be on the Corporation authorities to prevail upon the NHAI to put up a foot over bridge, said Raja, a trader in the town.


Share on FacebookShare on TwitterShare on Google+Report this post
Top
  
Reply with quote  
PostPosted: Thu Jul 07, 2011 11:35 pm 
திருச்சி - தஞ்சை சாலை: எஸ்.பி. ஆய்வு

திருவெறும்பூர், ஜூலை 6: திருச்சி மாவட்டம், திருவெறும்பூர் பகுதியில் உள்ள திருச்சி - தஞ்சை தேசிய நெடுஞ்சாலையை மாவட்டக் காவல் கண்காணிப்பாளர் ஆர். லலிதா லட்சுமி புதன்கிழமை ஆய்வு செய்தார்.
இந்தச் சாலையில் அடிக்கடி சாலை விபத்துகள் நிகழ்ந்து வருவதால், அதற்கான காரணத்தை ஆராய்வதற்காக திருச்சி மாவட்டக் காவல் கண்காணிப்பாளர் ஆர். லலிதா லட்சுமி, திருச்சி - தஞ்சை தேசிய நெடுஞ்சாலையில் நான்கு வழிச் சாலை அமைத்து வரும் மதுகான் நிறுவனத்தின் கட்டுமானத் துறை மேலாளர் சொக்கலிங்கம், திருவெறும்பூர் காவல் ஆய்வாளர் பாலமுருகன், போக்குவரத்து காவல் உதவி ஆய்வாளர் காமராஜ் ஆகியோருடன் சாலை விபத்துகள் அதிகம் நடைபெறும் இடங்களான காட்டூர், திருவெறும்பூர் கல்லணை பிரிவு சாலை, நவல்பட்டு பிரிவு சாலை, பெல் கணேசபுரம் ஆகிய பகுதிகளைப் பார்வையிட்டார்.

அப்போது, திருவெறும்பூர் கல்லணை பிரிவு சாலையில் உள்ள ஆட்டோ நிறுத்துமிடத்தை அகற்றவும், கட்டப்பட்டு வரும் திருவெறும்பூர் ரயில்வே மேம்பாலப் பணிகள், சாலைப் பணிகளை விரைவுபடுத்த வேண்டும். மேம்பாலப் பணிகள் அமைக்கும் போது, நவல்பட்டு சாலை செல்வதற்காக சுரங்கப் பாதை அமைக்க வேண்டும். பெல் கணேசபுரம் ரவுண்டானாவை குறைக்க வேண்டும் என்று மதுகான் நிறுவனத்தின் கட்டுமானத் துறை மேலாளர் சொக்கலிங்கத்திடம் மாவட்டக் காவல் கண்காணிப்பாளர் ஆர். லலிதா லட்சுமி கூறினார்.


Share on FacebookShare on TwitterShare on Google+Report this post
Top
  
Reply with quote  
PostPosted: Tue Jun 14, 2011 9:11 pm 
பால்பண்ணை- துவாக்குடி அணுகு சாலை விரைவில் நிறைவேற்றப்படும்

திருவெறும்பூர், ஜூன் 12: திருச்சி பால்பண்ணை- துவாக்குடி அணுகு சாலை விரைவில் நிறைவேற்றப்படும் என்றார் திருவெறும்பூர் சட்டப்பேரவைத் தொகுதி உறுப்பினர் எஸ். செந்தில்குமார்.

திருச்சி- தஞ்சாவூர் தேசிய நெடுஞ்சாலையில் கடந்த 2006-லிருந்து நான்குவழிச் சாலை அமைக்கும் பணி நடைபெற்று வருகிறது. இதில், திருச்சி பழைய பால்பண்ணை முதல் துவாக்குடி வரை அணுகு சாலை அமைக்கப்படவில்லை. இதனால், அடிக்கடி விபத்துகள் நேரிட்டு உயிரிழப்புகள் ஏற்பட்டு வந்தன.

இதையடுத்து, அந்தப் பகுதி மக்கள் ஒன்றிணைந்து திருச்சி பால்பண்ணை- துவாக்குடி அணுகு சாலை மீட்புக் கூட்டமைப்பு என்ற அமைப்பைத் தொடங்கி, அணுகு சாலை அமைக்க வலியுறுத்தி பல்வேறு போராட்டங்களில் ஈடுபட்டு வருகின்றனர்.

நான்குவழிச் சாலைப் பணிகள் தொடங்கி நான்கு ஆண்டுகள் கடந்த நிலையில், இதுவரை 296 பேர் பல்வேறு விபத்துகளில் சிக்கி உயிரிழந்துள்ளனர். தவிர, இப்போதுதான் திருவெறும்பூர் ரயில்வே மேம்பாலம், அரியமங்கலம் ரயில்வே மேம்பாலம் அமைக்கும் பணிகள் தொடங்கப்பட்டுள்ளன.

இதனிடையே, சட்டப்பேரவைத் தேர்தலின் போது தேமுதிக சார்பில் போட்டியிட்ட செந்தில்குமார், தான் வெற்றி பெற்றால் அணுகு சாலை அமைக்க நடவடிக்கை எடுக்கப்படும் என்று உறுதியளித்தார்.

தொடர்ந்து, அவர் பேரவைத் தேர்தலில் வெற்றி பெற்றதற்கு பாராட்டு தெரிவிக்கும் வகையிலும், அணுகு சாலை அமைக்க நினைவூட்டும் வகையிலும் திருவெறும்பூர் அருகேயுள்ள கைலாஷ்நகரில் ஞாயிற்றுக்கிழமை பால்பண்ணை- துவாக்குடி அணுகு சாலை மீட்புக் கூட்டமைப்பின் சிறப்புக் கூட்டம் நடைபெற்றது.

இதில், சட்டப்பேரவை உறுப்பினர் எஸ். செந்தில்குமார் பேசியது:

திருச்சி பால்பண்ணை- துவாக்குடி வரை அணுகு சாலை அமைப்பது தொடர்பாக தமிழக தலைமைச் செயலரிடம் எனது முதல் கேள்வியை பதிவு செய்துள்ளேன். அணுகு சாலை அமைப்பதற்காக திருச்சி மக்களவைத் தொகுதி உறுப்பினர் ப. குமார் தொடர்ந்து முயற்சி மேற்கொண்டு வருகிறார். அவருடன் நானும், மாவட்ட கவுன்சிலர் ராஜாவும் இணைந்து அதற்கான முயற்சிகளை தொடர்ந்து வருகிறோம்.

விரைவில் அணுகு சாலை அமைக்கப்படும். தொகுதி மக்கள் தங்களது குறைகள் தொடர்பாக 93445 56688 என்ற செல்போன் எண்ணிலோ, ம்ப்ஹ.ள்ங்ய்ற்ட்ண்ப்ந்ன்ம்ஹழ்க்ம்க்ந்ல்ஹழ்ற்ஹ்.ஸ்ரீர்ம் என்ற இ.மெயிலிலோ தொடர்பு கொள்ளலாம் என்றார் அவர்.

எல்லக்குடி ஊரக நலச் சங்கக் கூட்டமைப்புத் தலைவர் எஸ். சுப்பிரமணியன் தலைமை வகித்தார். மாவட்ட கவுன்சிலர் ஆர். ராஜா, அணுகு சாலை மீட்புக் கூட்டமைப்பு ஓருங்கிணைப்பாளர்கள் எம். சண்முகம், எஸ். சக்திவேல் ஆகியோர் முன்னிலை வகித்தனர்.

முன்னதாக ஓருங்கிணைப்பாளர் கே. விஸ்வநாதன் வரவேற்றார். எல்லக்குடி ஊரக நலச் சங்க கூட்டமைப்புப் பொருளாளர் வி. தாயுமான் நன்றி கூறினார்.


Share on FacebookShare on TwitterShare on Google+Report this post
Top
  
Reply with quote  
Display posts from previous:  Sort by  
Post new topic Reply to topic  [ 156 posts ]  Go to page Previous  1 ... 11, 12, 13, 14, 15, 16  Next

All times are UTC + 5:30 hours


Who is online

Users browsing this forum: No registered users and 1 guest


You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot post attachments in this forum

Search for:
Jump to:  
cron
Powered by phpBB® Forum Software © phpBB Group

Forum