Trichy to Chidambaram NH via Lalgudi and Ariyalur to be Widened and Developed Further: Nitin Gadkari

Quote:
Union Road Transport, Highways and Shipping Minister Nitin Gadkari on Thursday said road projects worth around Rs 60,000 crore has been sanctioned for Tamil Nadu.

The other road projects sanctioned for Tamil Nadu include Chennai-Tada, Trichy-Chidambaram National Highway, Poonamallee-Walajapet, and Villupuram-Nagapattinam.

Gadkari said that work on the above four projects would commence soon and the government will also look at construction of bus stations with the standards similar to airports.

He said 1,300 km stretch of new National Highway will be given to Tamil Nadu.
.




source: http://www.newindianexpress.com/states/tamil-nadu/2017/nov/23/road-projects-worth-around-rs-60000-crore-sanctioned-for-tamil-nadu-nitin-gadkari-1709223.html


Share on FacebookShare on TwitterShare on Google+Report this post
Top
 Profile  
Reply with quote  
PostPosted: Fri Nov 10, 2017 6:36 pm 
Offline

Joined: Thu Jan 22, 2009 8:43 pm
Posts: 11543
Has thanked: 118 times
Been thanked: 71 times
Work on bypass from Mathur to Panjapur moves at snail’s pace

While the bypass road constructed by the NHAI from Asoor, linking Tiruchi-Thanjavur Highway and Pudukottai Highway at Mathur, is in good use, the subsequent phase of work to extend the bypass link to Panjapur on the Madurai Highway is progressing slowly.

The bypass road from Asoor to Mathur is of much help for movement of heavy vehicles, especially lorries from BHEL and its ancillaries in Thuvakudi area to Pudukottai district.

The ancillaries in Mathur are also able to have a hassle-free road connectivity to BHEL because of the bypass road.

Extension of the 10-metre two-lane road with paved shoulders till Panjapur is much anticipated, since the need for vehicles from Thanjavur and delta districts proceeding to Southern districts to enter Tiruchi city will be obviated.

A senior NHAI official said the land acquisition process has been completed for laying the Mathur-Panjapur stretch and that one segment of the stretch has been laid from Kumaramangalam railway gate to the road linking K.K. Nagar. The NHAI has prevailed upon the concessionaire to expedite the process, it is learnt.

The by-pass road up to Panjapur, sources said, was originally planned to be over by 2014-15.

Once this section of the bypass is laid, it would form part of a semi-ring road as the NHAI would also lay a new bypass between Panchapur on the Tiruchi-Madurai Highway and Jeeyapuram on the Tiruchi-Karur Highway.

The NHAI had sought environmental clearance for a revised alignment of this road stretch from the Union Ministry of Environment as the original alignment, running across irrigation tanks, had was opposed by farmers.

http://www.thehindu.com/todays-paper/tp ... 086248.ece


Share on FacebookShare on TwitterShare on Google+Report this post
Top
 Profile  
Reply with quote  
PostPosted: Mon Nov 06, 2017 8:54 am 
Offline

Joined: Wed Sep 06, 2017 9:48 am
Posts: 142
Has thanked: 0 time
Been thanked: 2 times
Source:TOI


Attachments:
NH67.jpg
[Viewed 500 times ]
Share on FacebookShare on TwitterShare on Google+Report this post
Top
 Profile  
Reply with quote  
PostPosted: Mon Nov 06, 2017 8:51 am 
Offline

Joined: Wed Sep 06, 2017 9:48 am
Posts: 142
Has thanked: 0 time
Been thanked: 2 times
Image


Share on FacebookShare on TwitterShare on Google+Report this post
Top
 Profile  
Reply with quote  
PostPosted: Sat Oct 28, 2017 9:05 pm 
Offline

Joined: Thu Feb 21, 2013 11:17 am
Posts: 69
Has thanked: 0 time
Been thanked: 6 times
Image


Share on FacebookShare on TwitterShare on Google+Report this post
Top
 Profile  
Reply with quote  
PostPosted: Sat Oct 28, 2017 8:22 am 
Offline

Joined: Thu Jan 22, 2009 8:43 pm
Posts: 11543
Has thanked: 118 times
Been thanked: 71 times
Revision in expressway toll fee irks Trichy commuters

Even as the residents of Thiruverumbur and Kailasapuram are protesting for years seeking service road facility on a stretch of National Highways (NH) 67 between Thanjavur and Trichy, the decision of National Highways Authority of India (NHAI) and the private contractor taking care of the toll plaza near Valavanthankottai to revise the toll fee has not gone down well with the commuters. Stating that several amenities including a proper infrastructure for vehicles to take u-turn in a few median openings across the stretch had been absent, road users said that the toll fee could have been revised after establishing the required facilities for the users.

The stretch of National Highways 67 continues to be a busy route as most of the visitors are tourists reaching the delta districts dotted with pilgrim centres including Velankanni, Nagore, and Thanjavur. The toll plaza situated in Valavanthankottai between Thanjavur and Trichy stretch had been collecting Rs 55 for car/jeep/and van for single journey since September. However, the fee was increased by Rs 5 based on the legal provision to revise the toll fee annually as mentioned in the contract between the private firm that laid the NH and NHAI. The toll fee was reportedly revised only from October 15. The revision did not amuse a section of road users and residents belonging to Thiruverumbur as their longtime demand to install a service road for 14.5 km stretch between Thuvakudi and Thiruverumbur is yet to materialise. Besides the absence of service road facility, road users claimed that storage area (temporary halting space) for vehicles to take u-turn was missing at several crucial spots of the same stretch.

"In the available median openings, there should have been spaces earmarked for vehicles to halt before taking u-turn. Without such space in parts of Trichy-Thanjavur NH stretch, chances are high for vehicles to collide near the median openings," said, M Sekaran, president of Air, Rail, and Road Travelers Federation. Apart from the absence of storage space for median openings, inadequate reflectors near the delineating road on the same stretch was also raised as a complaint by the commuters. Irked by the hike in toll fee, road users and commuters went on to say that ahead of revision such amenities could have been provided by the NHAI or the private contractor. Similarly, works for establishing approach roads adjacent to the Thiruverumbur Road Over Bridge (ROB) and Ariyamangalam ROB are still pending between the Trichy-Thanjavur Expressway. When contacted, a senior NHAI official said that the revision was an annual exercise. "The contractor would be reiterated to complete the pending works," the official added.

https://timesofindia.indiatimes.com/cit ... CitiesNews


Share on FacebookShare on TwitterShare on Google+Report this post
Top
 Profile  
Reply with quote  
PostPosted: Thu Oct 05, 2017 12:00 pm 
Offline

Joined: Thu Oct 29, 2015 11:18 am
Posts: 4545
Has thanked: 86 times
Been thanked: 124 times
Trichy--Lalgudi--Ariyalur--Chidambaram NH likely to be 4-laned as Survey tells that 16,500 Vehicles cross the NH Daily


Image


http://epaper.dinakaran.com/pdf/2017/10/04/20171004g_017106012.jpg



sources
: Dinakaran and Dinamalar


Share on FacebookShare on TwitterShare on Google+Report this post
Top
 Profile  
Reply with quote  
PostPosted: Tue Oct 03, 2017 10:41 am 
Offline

Joined: Wed Sep 06, 2017 9:48 am
Posts: 142
Has thanked: 0 time
Been thanked: 2 times
Image


Share on FacebookShare on TwitterShare on Google+Report this post
Top
 Profile  
Reply with quote  
PostPosted: Mon Oct 02, 2017 8:51 am 
Offline

Joined: Thu Jan 22, 2009 8:43 pm
Posts: 11543
Has thanked: 118 times
Been thanked: 71 times
திருச்சி – கரூர் நெடுஞ்சாலையில்முதல்வர் வரும்போது மறியலில் ஈடுபட முடிவு
அனைத்து கட்சி கூட்டமைப்புடன் இன்று அமைதிப் பேச்சுவார்த்தை


அக்.4-ம் தேதி முதல்வர் வரும்போது, – கரூர் நெடுஞ்சாலையில் சாலை விரிவாக்கம் செய்ய வலியுறுத்தி மறியலில் ஈடுபடப் போவதாக அந்தநல்லூர் ஒன்றிய அனைத்து கட்சி கூட்டமைப்பு அறிவித்துள்ளது.

திருச்சி – கரூர் நெடுஞ்சாலையில் குடமுருட்டி முதல் முக்கொம்பு வரை சாலையின் அகலம் குறைவாகவும், ஆங்காங்கே வளைவுகளுடனும் இருப்பதால், அடிக்கடி விபத்துகள் நேரிடுகிறது. இதைத் தடுக்க சாலையை அகலப்படுத்தி, மையத்தடுப்பு அமைக்க வேண்டும். சாலையில் குண்டும், குழியுமாக உள்ள இடங்களை சீரமைக்க வேண்டும் என அப்பகுதி மக்களும், அனைத்து கட்சிகளின் கூட்டமைப்பும் நீண்டகாலமாக கோரிக்கை விடுத்து வந்தனர். ஆனால், எந்த நடவடிக்கையும் மேற்கொள்ளப்படவில்லை.

இந்நிலையில், அக்.4-ம் தேதி கரூரில் நடைபெற உள்ள எம்ஜிஆர் நூற்றாண்டு விழாவில் பங்கேற்பதற்காக முதல்வர் எடப்பாடி பழனிசாமி திருச்சியிலிருந்து இந்த சாலை வழியாக காரில் கரூர் செல்ல உள்ளார்.

இதற்கிடையே, இந்த சாலை சீரமைப்பை வலியுறுத்தி முதல்வர் எடப்பாடி பழனிசாமி இவ்வழியாக காரில் வரும்போது, ஜீயபுரத்தில் சாலை மறியல் போராட்டத்தில் ஈடுபட உள்ளதாக அந்தநல்லூர் ஒன்றிய அனைத்து கட்சிகள், சமூக ஆர்வலர்கள், விவசாய சங்கங்கள் அடங்கிய கூட்டமைப்பினர் அறிவித்துள்ளனர். இதற்கான போஸ்டர்களும் ஒட்டப்பட்டுள்ளன.

இதுகுறித்து கூட்டமைப்பின் ஒருங்கிணைப்பாளரான வினோத்மணி கூறும்போது, “சேதமடைந்த நிலையிலுள்ள குடமுருட்டி பாலத்தை அகற்றிவிட்டு புதிய பாலம் கட்ட வேண்டும். குடமுருட்டி முதல் அந்தநல்லூர் வரை சாலையை அகலப்படுத்த வேண்டும் வேண்டும். ஜீயபுரத்திலிருந்து திருச்செந்துறை வரை சர்வீஸ் சாலை அமைக்க வேண்டும்என்பன உள்ளிட்ட கோரிக்கைகளை வலியுறுத்தியும், சாலை விரிவாக்கத் திட்டம் தொடர்பாக முதல்வரின் கவனத்தை ஈர்க்கும் வகையிலும் இந்த போராட்டத்தை நடத்த முடிவு செய்துள்ளோம்.

இதற்காக அனைத்து கட்சியினர், கம்பரசம்பேட்டை, முத்தரசநல்லூர், பழூர், அல்லூர், ஜீயபுரம், அந்தநல்லூர் மற்றும் அதைச்சுற்றியுள்ள கிராமங்களில் உள்ள பொதுமக்கள், இளைஞர்கள், மாணவர்களை சந்தித்து அழைப்பு விடுத்து வருகிறோம்.

இதற்கிடையே, அனைத்து கட்சி கூட்டமைப்பினருடன் இன்று (அக்.2-) வட்டாட்சியர் அலுவலகத்தில் அமைதிப் பேச்சுவார்த்தைக்கு மாவட்ட நிர்வாகம், காவல்துறை ஏற்பாடு செய்துள்ளது. இதில், எங்களது கோரிக்கைகள் குறித்து உடன்பாடு எட்டப்படாவிட்டால், முதல்வர் வரும்போது நிச்சயம் போராட்டம் நடக்கும்” என்றார்.


Share on FacebookShare on TwitterShare on Google+Report this post
Top
 Profile  
Reply with quote  
PostPosted: Fri Sep 29, 2017 11:23 am 
Offline

Joined: Thu Jan 22, 2009 8:43 pm
Posts: 11543
Has thanked: 118 times
Been thanked: 71 times
திருச்சி அரை வட்ட சுற்றுச்சாலை பணிக்கு மத்திய அரசின் சுற்றுச்சூழல் இலாகா அனுமதி விரைவில் கிடைக்குமா?
9 ஆண்டுகளாக கிடப்பில் போடப்பட்ட திட்டத்தின் பரிதாப நிலை


Attachments:
ringroad29092017.jpg
[Viewed 1483 times ]
Share on FacebookShare on TwitterShare on Google+Report this post
Top
 Profile  
Reply with quote  
Display posts from previous:  Sort by  
Post new topic Reply to topic  [ 220 posts ]  Go to page 1, 2, 3, 4, 5 ... 22  Next

All times are UTC + 5:30 hours


Who is online

Users browsing this forum: No registered users and 2 guests


You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot post attachments in this forum

Search for:
Jump to:  
Powered by phpBB® Forum Software © phpBB Group

Forum