Trichyportal.com

Exclusive Forum on Trichy. Contact Info : trichyportal@gmail.com
It is currently Mon Jan 22, 2018 4:07 am


All times are UTC + 5:30 hours




Post new topic Reply to topic  [ 522 posts ]  Go to page 1, 2, 3, 4, 5 ... 53  Next
Author Message
 Post subject: Re: BHEL Trichy - News
PostPosted: Wed Jan 17, 2018 11:59 pm 
Offline

Joined: Thu Oct 29, 2015 11:18 am
Posts: 4781
Has thanked: 88 times
Been thanked: 137 times
BHEL bags Rs 2,800 crore order for power project in Maharashtra

Quote:
State-run power equipment maker BHEL on Wednesday said it has won a Rs 2,800 crore contract for 660 MW supercritical thermal power project in Maharashtra.

It will be set up as an expansion project of Maharashtra State Power Generation Company’s (MAHAGENCO) Bhusawal Thermal Power Station in Jalgaon district, BHEL said in a BSE filing.

BHEL’s scope of work for this brownfield expansion project includes design, engineering, manufacture, supply, construction, erection, testing and commissioning of 1X660 MW supercritical coal-based thermal set and civil works.

It said the 1,420 MW Bhusawal TPS(thermal power station) is equipped with 2 sets each of 210 MW and 500 MW ratings.

“The key equipment for the contract will be manufactured at BHEL’s Trichy, Haridwar, Bhopal, Ranipet, Hyderabad, Jhansi, Thirumayem and Bengaluru plants while the company’s power sector – western region shall be responsible for civil works and erection and commissioning of the equipment,” the company said.

BHEL said it has a longstanding partnership with MAHAGENCO and has a significant share of 81 per cent in the coal-based power stations installed in the state by the utility.The company is the market leader in both subcritical as well as supercritical segments in the country. (PTI)



source : https://www.ibcworldnews.com/2018/01/17/bhel-bags-rs-2800-crore-order-for-power-project-in-maharashtra/


Share on FacebookShare on TwitterShare on Google+Report this post
Top
 Profile  
Reply with quote  
Tags
BHEL Trichy , Jobs in BHEL Trichy, CSR BHEL Trichy, BHEL Trichy orders
 Post subject: Re: BHEL Trichy - News
PostPosted: Thu Jan 04, 2018 6:08 pm 
Offline

Joined: Thu Jan 22, 2009 8:43 pm
Posts: 11669
Has thanked: 124 times
Been thanked: 74 times
Power sector business environment remains challenging, says BHEL ED

The challenging business environment in the power sector still prevails, despite the better order-book position compared to the previous year, said R. Rajamanohar, Executive Director, BHEL, Tiruchi, here on Wednesday.

Addressing employees during the BHEL Day here, Mr.Rajamanohar said the foremost responsibility of every employee rested in meeting the expectations of customers in terms of quality of products, cost reduction and timely delivery. He expressed confidence that with the state-of-the-art manufacturing facilities and a large talent pool of skilled manpower, BHEL-Tiruchi would overcome all challenges and emerge successful in achieving its targets.

Referring to the diversification initiatives, Mr.Rajamanohar said that discussions were under way to add certain new products, including De-NOx systems to BHEL’s product range. BHEL-Tiruchi was also exploring potential business opportunities in the energy sector in line with the government’s efforts to pursue ‘coal to methanol’ and ‘bio gas to ethanol’ processes in an effort to reduce oil and gas imports, he said.

“Efforts were on to establish and demonstrate the technology of coal to methanol through gasification and chemical transformation with NITI Aayog’s assistance,” he said, according to BHEL press release.

Mr. Rajamanohar said that the ongoing development initiatives in the field of advanced ultra super critical power projects would pave the way for establishment of many welding and fabrication processes for Inconel materials.

On capital investments planned at BHEL, Mr Rajamanohar said that a 7.5 MW solar photo voltaic plant, the advanced technology products augmentation scheme and the Kollidam River Water Scheme for the township would be completed on a fast track basis.

Earlier, he hoisted the BHEL flag and administered pledge to employees.

R. Pannir, General Manager, Human Resources and Medical, and C. Arockisamy, Deputy General Manager, Administration, spoke.

Eight employees, who had donated the eyes of their family members and the wife of an employee who donated his body during 2017, were honoured by Mr.Rajamanohar on the occasion.

Prizes were also distributed to winners of various competitions held earlier in connection with BHEL Day celebration.

http://www.thehindu.com/todays-paper/tp ... 363536.ece


Share on FacebookShare on TwitterShare on Google+Report this post
Top
 Profile  
Reply with quote  
 Post subject: Re: BHEL Trichy - News
PostPosted: Tue Dec 19, 2017 12:28 pm 
Offline

Joined: Wed Sep 06, 2017 9:48 am
Posts: 203
Has thanked: 0 time
Been thanked: 3 times
CPI (M) seeks orders for BHEL ancillaries

Image

Members of the Communist Party of India (Marxist) presented a petition to the district authorities on Monday seeking the intervention of the State government to protect the interests of employees of ancillary units of BHEL.

In a representation to Collector R. Natarajan, Tiruverumbur Union secretary, CPI (M), urged the government to ensure that the ancillaries were given priority by BHEL in giving sub-contracting orders.

He demanded the cancellation of the recent annual BHEL tender, as a North India based company had reportedly resorted to ‘predatory pricing’ to bag most of the orders.

Already, some of the ancillary units had been closed as orders had dwindled since 2010.

Families of employees of ancillary units were hoping that the units would get good orders this year and there would be revival of their fortunes, he said.

http://www.thehindu.com/todays-paper/tp ... 908998.ece


Share on FacebookShare on TwitterShare on Google+Report this post
Top
 Profile  
Reply with quote  
 Post subject: Re: BHEL Trichy - News
PostPosted: Fri Dec 15, 2017 4:07 pm 
Offline

Joined: Thu Oct 29, 2015 11:18 am
Posts: 4781
Has thanked: 88 times
Been thanked: 137 times
BHEL wins massive Rs 7,300 cr order from TANGEDCO for Udangudi Power Plant

Quote:
Bharat Heavy Electricals Limited said it won a Rs 7,300 cr order to set up a 1,320 MW Supercritical Thermal Power Project (TPP) in Tamil Nadu.

Valued at over Rs.7,300 Crore, the order for setting up the 2×660 MW Udangudi TPP has been placed on BHEL by Tamil Nadu Generation and Distribution Corporation Limited (TANGEDCO), it said.

This is the fourth order for supercritical sets finalised in the last three years by TANGEDCO, and all the four orders have been won by BHEL.

The previous three orders viz 2×660 MW Ennore SEZ, 1×800 MW North Chennai Supercritical TPP Stage-Ill and 2×800 MW Uppur TPP were also secured by BHEL on ICB basis, reinforcing its position as the frontrunner in the power generation equipment industry in India.

Located at Udangudi in Thoothukudi district of Tamil Nadu, the greenfield project will be executed by BHEL on Engineering, Procurement, Construction (EPC) basis.

BHEL’s scope of work in the current contract involves design, engineering, manufacture, supply, erection, commissioning and civil works for the entire plant including sea water intake & outfall systems.

The key equipment for the project will be manufactured at BHEL’s Trichy, Haridwar, Bhopal, Ranipet, Hyderabad, Jhansi, Thirumayam and Bengaluru plants.

The company’s Power Sector – Southern Region shall be responsible for civil works, erection and commissioning of the equipment, it added.

“The implementation of the new projects will help foster growth in Tamil Nadu and provide easy access to electricity to the people of the state,” it said.

At present, BHEL has a significant share of 83% in the state’s coal-based generating capacity and has been a major partner in the power development programme of Tamil Nadu.

BHEL is the leading power equipment manufacturer in the country with 50 sets of supercritical boilers and 43 sets of supercritical turbine generators ordered on it. The orders have been received from Central, State as well as Private sector utilities.

It is one of the few government-owned companies that have remained largely competitive despite the entry of big multinational companies.


source: https://ultra.news/t-t/35643/bhel-wins-massive-rs-7300-cr-order-tangedco/

and

https://energy.economictimes.indiatimes.com/news/power/bhel-bags-rs-7300-crore-contract-for-supercritical-power-project-in-tamil-nadu/62082160


Share on FacebookShare on TwitterShare on Google+Report this post
Top
 Profile  
Reply with quote  
 Post subject: Re: BHEL Trichy - News
PostPosted: Thu Dec 14, 2017 11:06 am 
Offline

Joined: Thu Oct 29, 2015 11:18 am
Posts: 4781
Has thanked: 88 times
Been thanked: 137 times
BHEL-Trichy successfully executed orders from Indonesia Power Plants and other SE Asia Nations


Image


[B][U]source
: TOI


Share on FacebookShare on TwitterShare on Google+Report this post
Top
 Profile  
Reply with quote  
 Post subject: Re: BHEL Trichy - News
PostPosted: Sat Dec 09, 2017 7:01 am 
Offline

Joined: Thu Jan 22, 2009 8:43 pm
Posts: 11669
Has thanked: 124 times
Been thanked: 74 times
Ancillaries seek priority in getting BHEL orders

Expressing shock and dismay over alleged “predatory pricing" tactics of a Nagpur-based company, BHEL Small Industries' Association (BHELSSIA) on Friday appealed to the BHEL management to put on hold finalisation of annual tender, for ensuring survival of Tiruchi-based ancillaries struggling for existence for the last few years due to dwindling orders.

The particular company had, the BHELSIA complained, made the lowest quote for 24 out of 38 types of job works, slashing bidding by up to 20% from the existing level, with the purpose of building an order book.

The BHELSIA is apprehensive that the Tiruchi-based ancillaries which should get priority as per MSME policy, had been incapacitated in bidding for 85% of the total orders valued at Rs. 1,600 crore.

Considering the reality that the manufacturing profits is hardly three to five per cent, the BHEL has to take an appropriate decision considering the plight of the 250 ancillary industries with a workforce of over 40,000 labourers, BHELSIA president S. Ashok Sundaresan told media persons.

Fifteen companies have been closed down over the last few years, and about 60 more units were on the verge of closure, facing NPA (Non-Performing Assets) proceedings, BHELSIA president said.

The ancillaries of BHEL in Tiruchi which are famed throughout the country for their fabrication skills will go extinct if a corporate company is allowed to underbid in the tender, Mr Sundaresan said.

BHELSIA’s stand point is that firms in Tiruchi and Tamil Nadu should be given priority in grant of orders. Else, the ancillaries will be left with only two options - either accept the loss making price and incur a loss of Rs. 200 crore, or to go without work for a year, on account of foregoing the business loss of 2.25 lakh tonnes, accounting for 85% of the total annual transaction valued at Rs. 1365 crore, Mr Sundaresan said.

A study by Statistics Department of the State government has firmly recorded the industrial sickness in Tiruchi, and the BHEL order with fair pricing for the current year is the only hope for revival of these ancillaries.

“It is unfair on the part of BHEL to allow a corporate company to wipe out the MSMEs in this region after having asked us to invest in land and machinery and become ancillaries. The BHEL should reject the underbid predatory price and re-orient its tender policy by disclosing fair price”, Mr. Sundaresan said.

http://www.thehindu.com/todays-paper/tp ... 376702.ece


Share on FacebookShare on TwitterShare on Google+Report this post
Top
 Profile  
Reply with quote  
 Post subject: Re: BHEL Trichy - News
PostPosted: Sat Nov 04, 2017 5:02 pm 
Offline

Joined: Thu Oct 29, 2015 11:18 am
Posts: 4781
Has thanked: 88 times
Been thanked: 137 times
Product quality needs to be established at design stage

Quote:
Quality Month celebration begins in BHEL

The quality of a product must be established during the design phase and achieved through proper control during manufacturing rather than at the inspection and testing of final product stages, R Rajamanohar, Executive Director, BHEL Tiruchi, said on Wednesday.

Consistency in product quality was vital in today’s business environment, he said, addressing a gathering of product and functional heads, representatives of participating unions, engineers and officers’ association, executives’ association and other senior officials, after inaugurating the Quality Month celebration.

Mr. Rajamanohar said the main purpose of the exercise was to raise the level of awareness across the organisation, and encourage development of individuals thereby ensuring prosperity for the organisation.

Mr. Rajamanohar, who is also the Executive Director of Power Plant Piping Unit Thirumayam and Piping Centre, Chennai, said establishment and adherence to systems determines betterment of results and delivering products and services with the same level of consistency and reliability.

Ensuring customer satisfaction through consistently delivering quality products in time was the only way to survive in the present competitive business environment, he said.

Mr. Rajamanohar called upon all employees to re-dedicate themselves to maintain and achieve excellence in quality. Quality pledges were administered to the employees on the occasion. A message from Atul Sobti, Chairman and Managing Director, BHEL for the Quality Month was read out by R. Muthusamy, General Manager, Maintenance and Services. A ceremonial lamp was lit by the senior most employee of BHEL Tiruchi, L. Arokiaraj, General Technician, Boiler Production, to mark the start of the Quality Month.

Over 47 training and lecture programmes have been planned.



source: http://www.thehindu.com/todays-paper/tp-national/tp-tamilnadu/product-quality-needs-to-be-established-at-design-stage/article19978845.ece


Share on FacebookShare on TwitterShare on Google+Report this post
Top
 Profile  
Reply with quote  
 Post subject: Re: BHEL Trichy - News
PostPosted: Mon Oct 30, 2017 8:30 pm 
Offline

Joined: Thu Jan 22, 2009 8:43 pm
Posts: 11669
Has thanked: 124 times
Been thanked: 74 times
Singareni plans 800 MW capacity expansion

The Singareni Collieries Co Ltd has approved the expansion of the 1,200 MW coal fired thermal power plant, by addition of another unit of 800 MW.

The Board of Directors of the State-owned coal mining company Singareni Collieries, which met here chaired by the Chairman and Managing Director, N Sridhar, approved the expansion plan, while also awarding the contract for development of the project to BHEL.

The 1,200 MW thermal power plant, located at Jaipur in Mancherial district of Telangana State, was completed after the new State was formed. It has been functioning at high plant load factor and has been playing a major role in energy security of the newly carved out State.

In tune with the State Chief Minister K Chandrasekhar Rao's plan to provide energy for all, the State-owned generation company TS Genco and the Sinagreni Collieries have taken up major expansion projects.

This project contract, which entails setting up of an 800 MW super critical thermal power plant, has been awarded to BHEL. The Rs. 5,817-crore order is for the development of the project as an EPC contract covering boiler, generator and turbine (BTG) package.

BHEL was also the contractor for the two units of 600 MW each. It has now been awarded the contract by the State Government on nomination basis, as it is a State-owned enterprise.

The Chief Minister had earlier decided that the power plants would be executed by BHEL. This would augur well for both the State-owned entities but also keep leaders away from making allegations against the award of the contracts.

Recently, the State Government approved the detailed project report prepared by the company. Following this development, expansion is now being undertaken.

The State had also struck a deal with State-owned lenders Power Finance Corporation ans Rural Electrification Corporation for funding various power projects being taken up.

http://www.thehindubusinessline.com/new ... 931592.ece


Share on FacebookShare on TwitterShare on Google+Report this post
Top
 Profile  
Reply with quote  
 Post subject: Re: BHEL Trichy - News
PostPosted: Tue Oct 24, 2017 11:31 pm 
Offline

Joined: Thu Oct 29, 2015 11:18 am
Posts: 4781
Has thanked: 88 times
Been thanked: 137 times
BHEL starts execution of 4GW Yadadri power project in Telangana, India at acost of Rs 20,000 Crores

Quote:
.

Power equipment maker Bharat Heavy Electricals (Bhel) has commenced the execution of Rs204bn ($3.1bn) Yadadri supercritical thermal power project in the Indian state of Telangana.

Located at Damaracherla in Nalgonda district, the Yadadri thermal power station will be owned by state utility Telangana State Power Generation (TSGENCO) and will comprise five units, each with installed capacity of 800MW.

The execution of the 4,000MW Yadadri supercritical TPP by Bhel follows the issuance of revised letter of intent (LoI) by TSGENCO.

TSGENCO awarded engineering, procurement and construction (EPC) contract to Bhel for the Yadadri project in 2015.

Under the contract, Bhel is responsible for design, engineer, manufacture, supply, construct, erect, test and commission the Yadadri project.

Bhel will manufacture the key equipment for the project at its facilities in Trichy, Haridwar, Hyderabad, Bhopal, Ranipet, Bangalore and Jhansi.

The company has so far commissioned 86% of the coal-based power generation capacity in Telangana.

It said that the order for Yadadri TPP is the single-largest order for the firm as well as the highest value order ever placed in the India power sector.

The project, which will comply with the revised emission regulations, has already secured environmental approval by the Ministry of Environment, Forest and Climate Change (MoEF&CC).

TSGENCO earlier awarded contracts to Bhel to build 800MW supercritical thermal power plant at Kothagudem as well as 4x270MW Bhadradari power plant in Khammam, Telangana.



source: http://fossilfuel.energy-business-review.com/news/bhel-starts-execution-of-4gw-yadadri-power-project-in-telangana-india-241017-5954940


Share on FacebookShare on TwitterShare on Google+Report this post
Top
 Profile  
Reply with quote  
 Post subject: Re: BHEL Trichy - News
PostPosted: Tue Oct 24, 2017 3:27 pm 
Offline

Joined: Wed Sep 06, 2017 9:48 am
Posts: 203
Has thanked: 0 time
Been thanked: 3 times
Bhel starts execution of Rs20,400 crore Yadadri plant in Telangana

Image

State-run power equipment maker Bharat Heavy Electricals Ltd (Bhel) Monday said it has commenced execution of Rs20,400 crore Yadadri supercritical thermal power project ordered by Telangana State Power Generation Corporation.

“The execution of the 4,000 MW Yadadri Supercritical Thermal Power Project ordered on Bharat Heavy Electricals Limited (BHEL) by Telangana State Power Generation Corporation Limited (TSGENCO) has commenced with the issuance of revised Letter of Intent by TSGENCO,” Bhel said in a regulatory filing.

Bhel said that the project, valued at approximately Rs20,400 crore, is the single largest order for the company so far and is also the highest value order ever placed in the power sector in India.

“The project has been accorded environmental clearance” and would be compliant with the revised emission norms,” the PSU said. The project is located at Damaracherla in Nalgonda district of Telangana.

Bhel said the Yadadri project will be executed on fast track basis by the company in line with its strategy of focusing on revival of held up projects and their speedy execution. TSGENCO has earlier awarded contracts for 800 MW Kothagudem and 1,080 MW Bhadradri power projects to Bhel, which are under advanced stages of execution.

Source: www.livemint.com


Share on FacebookShare on TwitterShare on Google+Report this post
Top
 Profile  
Reply with quote  
Display posts from previous:  Sort by  
Post new topic Reply to topic  [ 522 posts ]  Go to page 1, 2, 3, 4, 5 ... 53  Next

All times are UTC + 5:30 hours


Who is online

Users browsing this forum: No registered users and 2 guests


You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot post attachments in this forum

Search for:
Jump to:  
Powered by phpBB® Forum Software © phpBB Group

Forum