NewsPost wrote:
Source:Dinakaran


Yes, this is happening every year


Share on FacebookShare on TwitterShare on Google+Report this post
Top
 Profile  
Reply with quote  
Tags
Trichy Airport news, Updates on Trichy airport, Infrastructure development at Trichy Airport
PostPosted: Mon Oct 16, 2017 9:09 am 
Offline

Joined: Wed Sep 06, 2017 9:48 am
Posts: 73
Has thanked: 0 time
Been thanked: 0 time
Source:Dinakaran


Attachments:
20171016.jpg
[Viewed 340 times ]
Share on FacebookShare on TwitterShare on Google+Report this post
Top
 Profile  
Reply with quote  
PostPosted: Mon Oct 16, 2017 1:45 am 
Offline

Joined: Sat Feb 06, 2016 12:15 am
Posts: 8
Has thanked: 0 time
Been thanked: 3 times
Airports need $45 billion investment to improve capacity by 2030: CAPA

India needs to invest up to USD 45 billion to create an additional capacity of handling 500- 600 million passengers at its airports by 2030 as their capacity is likely to saturate within the next five years, a study by an aviation think-tank said.

According to Centre for Asia Pacific Aviation (CAPA) estimates, the current capacity of the country's top 17 airports is between 298-316.5 million passengers per annum.

This is expected to increase to 431-463 million once the existing ..

CAPA notes that airports at Mumbai, Chennai, Delhi and Kolkata will reach their maximum capacity in the next one to five years, i.e. between 2019 and 2022, assuming passenger growth rate is 10 per cent per annum.

Also, 10 airports -- Pune, Jaipur, Srinagar, Lucknow, Dehradun, Agartala, Guwahati, Kozhikode, Mangalore, and Trichy -- managed by the Airports Authority of India (AAI), are already operating "beyond their design capacity".

Delhi's Indira Gandhi International Airport's current capacity is 64 to 72.5 million passengers per annum and its maximum structural capacity of 90-100 million passengers per annum is likely to be achieved by FY 2022, assuming a growth rate of 10 per cent.

Similarly, Mumbai's Chhatrapati Shivaji International Airport with a maximum capacity of 50-52 million passengers per annum is likely to saturate by FY 2019.
"The airport system is expected to exceed its maximum structural capacity by FY 2022, based on data available to CAPA as of June 2017," the CAPA report says.

It adds that if new projects are delayed and passenger traffic grows faster than the conservative estimate of 10 per cent, the threshold could be breached earlier than 2022.

"India will need to build an additional 500-600 million capacity by 2030. This will require USD 36-45 billion of investment, including USD 12-15 bill ..of investment, including USD 12-15 billion of equity capital," the report adds.
"The airport system is expected to exceed its maximum structural capacity by FY 2022, based on data available to CAPA as of June 2017," the CAPA report says.

It adds that if new projects are delayed and passenger traffic grows faster than the conservative estimate of 10 per cent, the threshold could be breached earlier than 2022.

"India will need to build an additional 500-600 million capacity by 2030. This will require USD 36-45 billion of investment, including USD 12-15 bill ..

Read more at:
//economictimes.indiatimes.com/articleshow/61087962.cms?utm_source=contentofinterest&utm_medium=text&utm_campaign=cppst


Share on FacebookShare on TwitterShare on Google+Report this post
Top
 Profile  
Reply with quote  
PostPosted: Sun Oct 15, 2017 11:46 am 
Offline

Joined: Sat Jun 19, 2010 12:50 pm
Posts: 274
Has thanked: 0 time
Been thanked: 6 times
Tamil Nadu airport expansions: in search of a second wind
Sunitha Sekar OCTOBER 14, 2017 23:42 IST
UPDATED: OCTOBER 15, 2017 00:53 IST


TY21AIRPORTTIRUCHI1
Tiruchi airport | Photo Credit: G_GNANAVELMURUGAN
Facilities across the State are in dire need of land expansion and augmentation of infrastructure. Crowding and serpentine queues can only be eliminated if the plans look far ahead into the future and factor in the rapid growth in traffic that will take place in the sector, experts say

In less than a decade, India will replace the United Kingdom as the third largest aviation market transporting 278 million passengers every year, the International Air Transport Association says. Time and again, this body has reiterated the need for the intelligent expansion of airports, as in the sterling case of Singapore’s Changi facility.

Closer home, the State government has chalked out expansion plans for various cities, including Chennai, Coimbatore, Madurai and Tiruchi. Of these, Chennai airport’s Phase I modernisation plan seems like a complete letdown with a host of infrastructure issues.

Four years after the completion of Phase I, the terminals are bursting at the seams with about 30,000 passengers travelling every day. The situation is especially bad during early mornings and late nights with the terminal choked with serpentine queues. Though services have marginally improved, there is quite a long way to go, passengers say. This has highlighted the need for the immediate implementation of Phase II after which as many as 30 million passengers can use the facilities.

Officials say that though the final nod for the project is yet to arrive from the Airports Authority of India (AAI), they will begin the safety inspection for the project soon. The phase II project has been planned in such a way as to give the terminals an integrated look. “It may take four years to complete and we will carry out this construction in two phases. We have carefully planned the work to ensure passengers don’t face any inconvenience,” an official says. The first phase will be over by January 2020 and the second by July 2021 and together, it will be open for operations by September 2021.

With Tanjore paintings, murals and statues, the airport’s facade will significantly change for the better, officials say. But these are just the aesthetics. Functional conveniences are miles away.

“We want to make sure there are no infrastructural issues, such as the breaking of glass panels or the collapse of false ceilings. We will ensure the toilets can be easily maintained,” another official says.

But with the promised deadline itself four years away, passengers have to grapple with the existing arrangements for quite sometime.

Meanwhile, there is no clarity on the future of the proposed greenfield airport for the city. The site has not been finalised yet. AAI officials say the project has to begin at the earliest, failing which passengers will suffer. “How long will the Phase II modernisation be enough? After a few years, the terminal will get saturated again. Finalising the land, acquiring it and getting the necessary permissions will take about 5-6 years. Unless the work starts now, the going will be tough,” an official says.

The proposal for the greenfield airport also envisions splitting domestic and international operations with the new airport to take care of the latter. But this may bring fresh challenges. “If the terminals are around 40 km from each other, the State may have to build an expressway or a Metro Rail corridor to connect them. Otherwise, passengers might suffer,” he adds.

Competitive growth

Despite a competitive growth in traffic, airports in cities such as Madurai, Tiruchi and Coimbatore still await expansion.

Tiruchi, the largest airport after Chennai (in handling overseas passengers and flight movements in the State), with over 100 overseas flight operations every week to six foreign destinations, is on a major expansion mode as the decks have been cleared for the acquisition of land for the extension of the runway and funds sanctioned for the construction of a new international terminal. The new passenger terminal building would be five times the size of the existing one and will come up on 67,500 square metres with a basement to accommodate utilities.

Preliminary works connected with runway expansion and the construction of a two-level passenger terminal building adjoining the existing one have commenced.

After getting administrative sanction from the State government for the acquisition of over 300 acres of land in the airport’s vicinity, the district administration issued a notification and is receiving objections from the private land owners.

Simultaneously, the transfer of over 25 acres of government land to the AAI is also on, Tiruchi District Collector K. Rajamani says.

The district administration will send a proposal to the State government regarding the fixation of value for the land to be acquired by October-end or November, Mr. Rajamani says, adding that the land required for runway expansion will be handed over to the AAI within the specified time.

After several years of delay, the stage is now set for the expansion of the runway from the existing 8,000 feet to 12,500 feet, which is required to handle wide-bodied aircraft. Meanwhile, AAI has engaged a French consultant to prepare the designs and plan for the swanky structure with a multi-level car parking facility.

The Project Management Consultant engaged by the AAI has begun the spade work by conducting soil investigation — a prerequisite ahead of construction — at the proposed site, says Tiruchi airport director K. Gunasekaran.

The consultant will provide the designs of the proposed structure to the AAI for final approval. Mr. Gunasekaran says the physical work for the mega project will commence next year. The entire project is expected to be completed in three years.

Cramped facilities

Madurai airport, which currently sees 20 landings a day, has been a major link to various parts of the country, and even the world, especially after the introduction of low-cost airlines in the mid-2000s. It got its steel-and-glass 17,500 sq. ft. integrated terminal building in 2010. But after flights to Dubai, Singapore and Colombo began operating, there has been a renewed need for expansion.

The arrival and departure halls are cramped. “The halls were designed to handle 250 passengers each. But, it is very congested now. We have proposed to expand the terminal building to accommodate more passengers,” airport director, V.V. Rao, says. That apart, nearly 615 acres of land has to be acquired for the proposed extension of the runway from 7,500 feet to 12,500 feet. Though the Tamil Nadu Government notified the land acquisition in 2008, the process is far from over.

“At present, bigger aircraft are landing with load restrictions due to a shorter runway. In the initial phase, we propose to extend the runway to 11,000 feet whereby wide-bodied aircraft can land,” he adds.

Snail’s pace

The development of Coimbatore International Airport that serves seven districts in the Kongu region and parts of Kerala has been proceeding at a snail's pace with a delay of more than 10 years in land acquisition for expansion works.

According to airport director R. Mahalingam, a budget allocation of ₹1,000 crore for the expansion of the terminal building and ₹500 crore for developmental activities in the operation areas, such as the runway, remain unused due to the delay. The plan is to acquire 627.89 acres of land.

The airport also does not meet the Directorate General of Civil Aviation’s (DGCA) criteria for a basic strip — 150 metres on either side of the runway from the centre line. This is a major safety requirement. For over 10 years, the DGCA has been been extending the licence of the airport every two years though the width of the basic strip remains unchanged. The present runway of 10,000 feet currently has only 50% of the basic strip. Due to this, the runway lacks the space to accommodate bigger aircraft. Acquisition of around 50 acres is required to widen bathe sic strip. Despite having registered an increase of more than 20% in passenger traffic and cargo movement in the last financial year, the airport is losing a significant share of passenger and cargo traffic due to its inability to host more international flights, especially to the Middle East and European countries.

High hopes

Investors are looking forward with huge hopes to the expansion of the Thoothukudi airport, which only caters to passengers bound for Chennai as of now. Only smaller ATR model aircraft are operational from this airport.

The district administration has handed over 366.24 acres of patta land acquired as per the Land Acquisition Act to the AAI. A total of 600.93 acres has been identified for the expansion of the Vagaikulam airport from adjoining villages, including Kumaragiri, Kattalangulam, Mudivaithanendal and Servaikaranmadam.

The required acreage for the airport expansion is planned to be acquired in 13 blocks in the district. Of these, land acquisition is over in eight blocks of which the interim award has been extended to land owners in six blocks, sources say.

On a priority basis, 72 more acres need to be acquired and handed over to the AAI soon to create extend the runway from 4,429 feet to 6,561 feet so as to accommodate bigger aircraft. Apart from Spicejet that connects Thoothukudi and Chennai daily, two more airlines have now expressed an interest in operating flights. Hence, a night navigation facility has to be established at the earliest.

Since Thoothukudi has a seaport, there is potential for promoting air shipping, R. Edwin Samuel, vice-president, ICCI, Thoothukudi, says. Thoothukudi airport also needs infrastructure development on par with the seaport here. With a good trade link between Thoothukudi and Colombo in Sri Lanka, air cargo operations are also viable.

J. Jeyasingh Thiyagaraj Natterjee, Thoothukudi MP, says that infrastructure for night landing of flights is ready but approval to operate the facility is awaited. State government authorities need to expedite the land acquisition process and hand over the entire portion of land required for expansion to the AAI.

He says a few high-rise structures in the 10-mile radius of the approach funnel of this airport are yet to be included in the aerodrome obstruction chart.

Red lamps atop such high-rise structures should be installed for air navigation at night. Mr. Natterjee says he has raised this issue in Parliament.

Sources say the 1,086 feet high Vallanadu Hills might cause some obstruction to navigation. The matter has been taken up with the Department of Forests.

(With inputs from S. Sundar in Madurai, R. Rajaram in Tiruchi, J. Praveen Paul Joseph in Thoothukudi and Wilson Thomas in Coimbatore)


Share on FacebookShare on TwitterShare on Google+Report this post
Top
 Profile  
Reply with quote  
PostPosted: Fri Oct 13, 2017 11:56 am 
Offline

Joined: Thu Oct 29, 2015 11:18 am
Posts: 4411
Has thanked: 84 times
Been thanked: 115 times
HC to Customs: Notify International Courier Cargo from TRZ International Airport within 3 months

Quote:
The Madurai bench of Madras high court has directed customs authorities to issue notification for the much-delayed courier import and export operation in Trichy international airport within three months.

Customs had cited the absence of basic requirements like LAN (Local Area Network) and WAN (Wide Area Network) connectivity for not notifying the air courier services.

They said that without these facilities IGM (Import General Manifest) and EGM (Export General Manifest), which are basic documents for incoming and outgoing cargo, could not be filed by courier operators.

However, the association had said in its counter affidavit that LAN and WAN connectivity had been provided on courier terminal at Trichy airport with effect from July 22.

Airports Authority of India, Trichy, the custodian of the courier service, had made all infrastructural arrangements at the courier terminal separately.

Even after the ministry of finance notified Trichy international airport for launching operations of the courier services, the customs authorities had been delaying a notification on their part, alleged S A Sayeed, president, Express Courier Operators Association.

"Once the courier service comes into operation,household articles or any essential items can be sent or received with the help of international courier.

Things like medical reports, tissue culture, scientific components, printed sheets could also be sent through the facility
.

As per the Customs Act, except gold, currency and some banned drugs, all other things can be sent. Unlike another modes of clearance, it would be sent very fast to a particular destination", he said.

As of now, courier agencies are using either Chennai or Bangalore for sending their consignments.




source: https://timesofindia.indiatimes.com/city/trichy/hc-to-customs-notify-air-courier-ops-from-airport/articleshow/61059953.cms


Share on FacebookShare on TwitterShare on Google+Report this post
Top
 Profile  
Reply with quote  
PostPosted: Thu Oct 12, 2017 8:26 pm 
Offline

Joined: Thu Oct 29, 2015 11:18 am
Posts: 4411
Has thanked: 84 times
Been thanked: 115 times
TRZ International Airport clocked 9,760 Foriegn Tourist Arrivals (FTA's) in Sept 2017 and Ranked 12th Gateway in India for FTA

Quote:
The number of FTAs in September, 2017 were 7.23 lakh as compared to FTAs of 6.08 lakh in September, 2016 and 5.43 lakh in September, 2015.

The growth rate in FTAs in September, 2017 over September, 2016 is 18.8% compared to 12.1% in September, 2016 over September, 2015.

FTAs during the period January- September 2017 were 71.20 lakh with a growth of 15.5% over same period of previous year, as compared to the FTAs of 61.63 lakh with a growth of 9.8% in January- September 2016 over January- September 2015.

The percentage share of Foreign Tourist Arrivals (FTAs) in India during September 2017 among the top 15 source countries was highest from Bangladesh (29.65%) followed by USA (10.24%), UK (7.04%), Sri Lanka (3.98%), Australia (3.50%), Malaysia (3.32%), Germany (2.57%), Japan (2.50%), China (2.46%), Canada (2.40%), Nepal (2.30%), France (1.86%),Singapore (1.77%), Rep. of Korea (1.40%) and Afghanistan (1.21%).

The percentage share of Foreign Tourist Arrivals (FTAs) in India during September 2017 among the top 15 ports was highest at Delhi Airport (28.69%) followed by Haridaspur Land Check Post (16.06%), Mumbai Airport (13.57%), Chennai Airport (6.56%), Bengaluru Airport (5.36%), Kolkata Airport (5.08%), Gede Rail Land Check Post (3.70%), Cochin Airport (2.88%),Hyderabad Airport (2.83%), Ghojadanga Land CheckPost (2.08%), Ahmedabad Airport (1.51%), Tiruchirapalli Airport (1.35%), Trivandrum Airport (1.17%), Agartala Land Check Post (1.14%) and Sonauli Land Check Post (1.00%).




^^^^^^^^
When Calculated for TRZ, it comes (7,30,000 * 1.35)/100)==9,760 FTA's





TRZ International Airport Clocked 944 E-Tourist Visa on Arrival in Sept 2017 and Ranked 11th Gateway in India for E-Tourist Visa on Arrival

Quote:
During the month of September, 2017 total of 1.18 lakh tourist arrived on e-Tourist Visa as compared to 0.69 lakh during the month of September 2016 registering a growth of 71.0%.

During January- September 2017, a total of 10.67 lakh tourist arrived on e-Tourist Visa as compared to 6.75 lakh during January- September 2016, registering a growth of 58.0%.

The percentage shares of top 15 source countries availing e- Tourist Visa facilities during September, 2017 were as follows:

UK (12.1%), USA (10.2%), China (6.3%), Australia (5.5%), Germany (4.9%), France (4.3%), Spain (3.9%), Israel (3.2%) Korea (Rep.of) (3.2%), Oman (3.2%), Canada (3.1%), Singapore (2.6%), UAE (2.2%), Malaysia (2.1%) and Italy (2.1%).

The percentage shares of top 15 ports in tourist arrivals on e-Tourist Visa during September, 2017 were as follows:

New Delhi Airport (53.4%), Mumbai Airport (18.5%), Chennai Airport (6.7%), Bengaluru Airport (6.3%), Kochi Airport (4.2%), Hyderabad Airport (2.8%), Kolkata Airport (2.2%), Amritsar Airport (1.1%), Trivandrum Airport (1.0%), Ahmadabad Airport (0.9%), Tirchy Airport (0.8%), Dabolim (Goa) Airport (0.6%), Calicut Airport (0.5%),Jaipur Airport (0.4%) and Pune Airport(0.2%).



^^^^^^
When calculated for TRZ, it comes as ((1,13,000* 0.8)/100)====944 E-Tourist Visa on Arrivals


Source
: http://www.business-standard.com/article/news-cm/18-8-growth-in-foreign-tourist-arrivals-in-september-2017-over-september-2016-117101200769_1.html


Share on FacebookShare on TwitterShare on Google+Report this post
Top
 Profile  
Reply with quote  
PostPosted: Thu Oct 12, 2017 7:37 pm 
Offline

Joined: Thu Oct 29, 2015 11:18 am
Posts: 4411
Has thanked: 84 times
Been thanked: 115 times
New integrated Terminal Building at Rs 920 Crores-----Design Finalized


Image


Image


courtesy: Manivannan from SSC


The design was Finalized on Monday Evening at Trichy International Airport when a special meeting was conducted which was attended by AAI, Trichy Airport Director and French based Consultant responsible for Design

They have got approval from AAI and this is the Final Design

As the consultant is from France, they have added some Magnificient Elegant Touch to the design which when executed will give a Stunning Look

The Design was sent to almost all newspapers on Tuesday but none of them came forward publishing it except Tamil Hindu---Hope, in the coming days, others will follow suit

Soil Test Works are going on Now

Tenders will be called by December and Works slated to start from March/April 2018

Runway LA works going on with some opposition from Locals--They are hoping that LA will be over by April 2018, so that both the works may start from Mid-2018


Share on FacebookShare on TwitterShare on Google+Report this post

These users thanked the author ilovetrichy for the post: francistrichy (Thu Oct 12, 2017 10:12 pm)
  Rating: 25%
Top
 Profile  
Reply with quote  
PostPosted: Tue Oct 10, 2017 9:16 am 
Offline

Joined: Thu Jan 22, 2009 8:43 pm
Posts: 11445
Has thanked: 113 times
Been thanked: 68 times
70 சதவீதத்துக்கும் அதிகமாக நிரம்பும் இருக்கைகள் திருச்சி- சென்னை விமானங்களுக்கு வரவேற்பு

Image


Share on FacebookShare on TwitterShare on Google+Report this post
Top
 Profile  
Reply with quote  
PostPosted: Sun Oct 08, 2017 11:42 am 
Offline

Joined: Thu Oct 29, 2015 11:18 am
Posts: 4411
Has thanked: 84 times
Been thanked: 115 times
International Cargo Stats for TRZ since April 2015


Image



courtesy: Naveenmech from SSC


Share on FacebookShare on TwitterShare on Google+Report this post
Top
 Profile  
Reply with quote  
PostPosted: Thu Oct 05, 2017 11:58 am 
Offline

Joined: Thu Oct 29, 2015 11:18 am
Posts: 4411
Has thanked: 84 times
Been thanked: 115 times
Image


source: IE



^^^^
Customs,the great Villain of TRZ :evil: :evil:


Share on FacebookShare on TwitterShare on Google+Report this post
Top
 Profile  
Reply with quote  
Display posts from previous:  Sort by  
Post new topic Reply to topic  [ 2804 posts ]  Go to page 1, 2, 3, 4, 5 ... 281  Next

All times are UTC + 5:30 hours


Who is online

Users browsing this forum: No registered users and 1 guest


You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot post attachments in this forum

Search for:
Jump to:  
Powered by phpBB® Forum Software © phpBB Group

Forum