Trichyportal.com

Exclusive Forum on Trichy. Contact Info : trichyportal@gmail.com
It is currently Mon Dec 18, 2017 10:09 pm


All times are UTC + 5:30 hours




Post new topic Reply to topic  [ 2280 posts ]  Go to page Previous  1 ... 7, 8, 9, 10, 11, 12, 13 ... 228  Next
Author Message
PostPosted: Tue Aug 01, 2017 7:13 pm 
Offline

Joined: Thu Jan 22, 2009 8:43 pm
Posts: 11601
Has thanked: 123 times
Been thanked: 74 times
Image


Share on FacebookShare on TwitterShare on Google+Report this post
Top
 Profile  
Reply with quote  
PostPosted: Tue Aug 01, 2017 1:10 pm 
Offline

Joined: Sat Feb 20, 2016 9:09 pm
Posts: 40
Has thanked: 49 times
Been thanked: 8 times
INSPECTION OF THE NEWLY LAID SECOND BROAD GAUGE RAILWAY LINE BETWEEN SOLAGAMPATTI - PONMALAI RAILWAY STATIONS AND SPEED TRIAL

Commissioner of Railway Safety, Southern Circle, Bangalore will inspect the newly laid second broad gauge railway line between Solagampatti – Ponmalai railway stations in Villupuram – Tiruchchirappalli Main Line section of Tiruchchirappalli Division of Southern Railway o­n 02nd August, 2017.




Furthermore, the Commissioner of Railway Safety, Southern Circle, Bangalore will also conduct a high speed trial run between Solagampatti – Ponmalai railway stations o­n 02nd August, 2017 between 16.00 hrs. – 18.00 hrs.



All users of railway lines between Solagampatti – Ponmalai railway stations in Thanjavur – Tiruchchirappalli section of Tiruchchirappalli Division are hereby cautioned not to approach / trespass the railway lines.


Share on FacebookShare on TwitterShare on Google+Report this post
Top
 Profile  
Reply with quote  
PostPosted: Tue Aug 01, 2017 6:57 am 
Offline

Joined: Thu Jan 22, 2009 8:43 pm
Posts: 11601
Has thanked: 123 times
Been thanked: 74 times
.


Attachments:
train.jpg
[Viewed 1650 times ]
Share on FacebookShare on TwitterShare on Google+Report this post

These users thanked the author Aravindh for the post: francistrichy (Tue Aug 01, 2017 3:14 pm)
  Rating: 25%
Top
 Profile  
Reply with quote  
PostPosted: Mon Jul 31, 2017 10:36 am 
Online

Joined: Thu Oct 29, 2015 11:18 am
Posts: 4646
Has thanked: 88 times
Been thanked: 134 times
Initial works for 156 km longTrichy--Karaikal--Velankanni line electrification started


Image


source: Dinamani


Share on FacebookShare on TwitterShare on Google+Report this post

These users thanked the author ilovetrichy for the post: francistrichy (Tue Aug 01, 2017 10:10 pm)
  Rating: 25%
Top
 Profile  
Reply with quote  
PostPosted: Sun Jul 30, 2017 10:01 am 
Offline

Joined: Thu Jan 22, 2009 8:43 pm
Posts: 11601
Has thanked: 123 times
Been thanked: 74 times
Image


Share on FacebookShare on TwitterShare on Google+Report this post
Top
 Profile  
Reply with quote  
PostPosted: Thu Jul 27, 2017 10:16 am 
Offline

Joined: Sat Jun 19, 2010 12:50 pm
Posts: 275
Has thanked: 0 time
Been thanked: 6 times
First part of track doubling in Tiruchi-Thanjavur section over
R Rajaram TIRUCHI, JULY 26, 2017 08:41 IST
UPDATED: JULY 26, 2017 08:41 IST
SHARE ARTICLEPRINT AAA

TY26GOLDENROCK
A view of the Ponmalai railway station in Tiruchi. | Photo Credit: M. Srinath
Remaining work to be completed before December; project cost is ₹ 400 crore

The first portion of the track doubling project being executed from Ponmalai in Tiruchi to Thanjavur has been completed.

With the second railway line in the 19-km stretch from Ponmalai station to Solagampatti station having been laid along with completion of other works, this section is ready for statutory inspection by the Commissioner of Railway Safety (CRS), Bengaluru, on August 2. Five major bridges and 38 minor bridges have been constructed as part of the project.

The Rail Vikas Nigam Limited (RVNL) has been entrusted with the task of executing the track doubling project in the 47-km stretch from Ponmalai to Thanjavur at an estimated cost of ₹ 400 crore.

The work which was initially done by the construction organisation of the Southern Railway was handed over to the RVNL which is executing the doubling project from Villupuram to Dindigul via Tiruchi.

A senior official said works in the remaining portion from Solagampatti to Thanjavur Railway Junction (28 km) were apace and would be completed before December. New station buildings have been constructed at Tiruverambur and Tondamanpatti.

Foot over bridges have been constructed at Tiruverambur besides at Solagampatti station.

A bypass railway line has been laid for a distance of nearly four km ahead of Ponmalai railway station to enable freight trains proceeding towards Ariyalur side from stations in the delta region without touching Ponmalai railway station.

The second railway line between Ponmalai and Thanjavur was cleared by the Railway Board, New Delhi, in view of the steady movement of freight trains from Karaikal and other stations in the delta region and headed to different destinations besides rise in the number of passenger trains in the Tiruchi-Thanjavur-Tiruvarur-Nagapattinmam-Karaikal section and Tiruchi-Thanjavur-Kumbakonam and Mayiladuthurai section.

Some of the express trains that runs in the Thanjavur-Tiruchi section include the Tiruchi - Chennai Cholan Express, Mysore – Mayiladuthurai, Karaikal-Ernakulam Tea Garden and Coimbatore-Mayiladuthurai Jan Shatabdhi expresses every day.


Share on FacebookShare on TwitterShare on Google+Report this post
Top
 Profile  
Reply with quote  
PostPosted: Tue Jul 25, 2017 10:35 pm 
Offline

Joined: Mon Mar 08, 2010 4:55 pm
Posts: 4819
Has thanked: 41 times
Been thanked: 114 times
Coming Thrusday (27.07.2017) onwards IR introducing weekly train services from Rameshwaram to Ayodhya / Faizabad via Karaikudi, Trichy and by passing Madurai.


Share on FacebookShare on TwitterShare on Google+Report this post
Top
 Profile  
Reply with quote  
PostPosted: Sun Jul 23, 2017 5:13 pm 
Online

Joined: Thu Oct 29, 2015 11:18 am
Posts: 4646
Has thanked: 88 times
Been thanked: 134 times
Image



source: Dinakaran


Share on FacebookShare on TwitterShare on Google+Report this post
Top
 Profile  
Reply with quote  
PostPosted: Sat Jul 22, 2017 6:28 pm 
Offline

Joined: Thu Jan 22, 2009 8:43 pm
Posts: 11601
Has thanked: 123 times
Been thanked: 74 times
Image


Share on FacebookShare on TwitterShare on Google+Report this post
Top
 Profile  
Reply with quote  
PostPosted: Sat Jul 22, 2017 10:06 am 
Offline

Joined: Thu Jan 22, 2009 8:43 pm
Posts: 11601
Has thanked: 123 times
Been thanked: 74 times
Special trains to Chennai, Kochuveli

Southern Railway will operate the following superfast special fare trains between Tiruchi and Chennai Egmore:

Train No.06026 will leave Tiruchi at 3.25 p.m. on August 5, 12, 19 and 26 and reach Chennai Egmore at 9.10 p.m. Train No.06025 will leave Chennai Egmore at 9.45 a.m. on August 9, 16, 23 and 30 and reach Tiruchi at 3.15 p.m. These trains will stop at Ariyalur, Vriddhachalam, Villupuram, Chengalpattu and Tambaram. The Chennai-bound train will stop at Mambalam also.

Train No.06044 will leave Kochuveli at 3.15 p.m. on August 2, 9, 16, 23 and 30 and reach Karaikal at 3.45 a.m. the next day. Train No.06043 will leave Karaikal at 10.45 p.m. on August 3, 10, 17, 24 and 31 and reach Kochuveli at 12.25 p.m. the next day. The trains will stop at Thiruvananthapuram, Nagercoil Town, Tirunelveli, Kovilpatti, Sattur, Virudhunagar, Madurai, Dindigul, Tiruchi, Thanjavur, Tiruvarur, Nagapattinam and Nagore.

http://www.thehindu.com/todays-paper/tp ... 328490.ece


Share on FacebookShare on TwitterShare on Google+Report this post
Top
 Profile  
Reply with quote  
Display posts from previous:  Sort by  
Post new topic Reply to topic  [ 2280 posts ]  Go to page Previous  1 ... 7, 8, 9, 10, 11, 12, 13 ... 228  Next

All times are UTC + 5:30 hours


Who is online

Users browsing this forum: ilovetrichy and 3 guests


You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot post attachments in this forum

Search for:
Jump to:  
Powered by phpBB® Forum Software © phpBB Group

Forum